Envirodrilling UK Limited

 

Landfill, Geotechnical, Water & Geothermal Drilling

 

Saddle Hill Farm, 277 Preston Road,

Standish, Lancashire, WN6 0NZ

 

Tel: 01257 472 399

Fax: 01257 472 647

 

info@envirodrillinguk.com

 

 

Home Casagrande C6 Casagrande C8 FD 2000 FD 2000 HD Hutte 205 GT Mud Puppy

 

Landfill Drilling
Geothermal Drilling
Monitoring
Water Wells
Vented Wells
Recruitment
Turnkey Projects
Links

 

 

 

 

 

 

 

 

Vented  Wells

 

Vented wells from 150 or 200mm diameter steel pipes, hinged 1.5m from ground level.  A holder  at the hinge  is used for placing activated carbon for odour control.  Vents are generally  installed in a 750mm deep concrete base with the gas well running into the vent pipe.

                       

Vents can be fitted with fixed cages or rotating cowls and be manufactured out of PE or stainless steel.

               

Various diameters, heights and colours can be offered to suit specifications.

 

 

Pin Wells

 

We currently install 90mm and 63mm pin wells to typical depths of 10-15m dependent on ground conditions.

 

These can be with or without stone surround, and fitted with headworks as for gas wells depending on the requirements of the client.

 

 

Temporary Casings

 

Temporary casings  are used to keep the borehole open in bad ground conditions prior to the installation of the required final pipe installation..

 

The use of casings ensures that the final installation is lowered into a clean borehole,  a clean and guaranteed stone pack is placed for the entire depth of the borehole and that the stone is uncontaminated from the silts and mud's generated from the drilling process.

                          

Casing can be installed from a diameter of 125mm up to 520mm.

 

 

 

 

          © copyright Envirodrilling UK Limited. 2009.     

                                                      Terms & conditions Privacy